The SLD dewaxing and debinding mesh belt furnace is engineered as the critical first thermal stage in metal injection molding and ceramic injection molding production, removing the polymeric binder from green parts under a controlled, slowly ramped temperature profile before sintering. A 300mm wide mesh belt carries the parts through three temperature zones up to a working temperature of 600C, while a dedicated multi path exhaust system evacuates the decomposed binder vapors